Repair and reconstruction of production buildings and workshops, finishing of facades, repair of walls, interior and exterior works.
Improvement of the territory of the plant.
General construction works – dismantling and installation of linoleum flooring.
Ventilation system design and installation.
Ventilation system design and installation.
Project details
The additional challenge of the project included sterile conditions of the pharmaceutical plant, which required dust-free execution of works in the ongoing production plant.